Cut your heat-loss in half, jump to a BER A rating, and future-proof your home against rising energy bills — all with one carefully detailed wrap-around system.

External Wall Insulation in Blackrock & Coastal South Dublin

image
image

VS Builders | External Wall Insulation

SEAI One-Stop-Shop partner
grants up to €40,000

BCAR-compliant install
U-value ≤ 0.27 W/m²K

EPS & Mineral-Wool EWI systems
NSAI-certified

WHY EXTERNAL WALL INSULATION? 

Most mid-century homes in Blackrock, Monkstown, Mount Merrion, Stillorgan and Dún Laoghaire lose up to 35 % of their heat straight through solid walls. External wall insulation wraps the shell in 100–150 mm of EPS or mineral-wool, stopping draughts and raising indoor temperatures by up to 5 °C on like-for-like boiler use. Done right, you can expect a BER leap from “E” or “F” to A-rating and energy-bill cuts of 30 – 40 %.

SEAI Grants for External Wall Insulation

Grant pathway Ideal for EWI coverage Need-to-know
Individual Energy Upgrade Grant
(“External Wall Insulation – The Wrap”)
Any homeowner or landlord with a house built before 2011 Stand-alone wrap of 100–150 mm insulation plus new breathable render Apply online, choose an SEAI-registered contractor, grant is paid after post-works BER
One-Stop-Shop Home Energy Upgrade Homeowners aiming for a full deep-retrofit and a B2 BER (or better) in one project EWI bundled with attic insulation, heat-pump prep, airtightness & solar options One provider handles survey, paperwork, works and grants — discount shown on your invoice up-front
Warmer Homes Scheme
(Fully-Funded)
Owner-occupiers on qualifying social-welfare payments EWI plus attic insulation, draught-proofing and basic heating upgrades SEAI manages everything; no cost to the homeowner — waiting list applies
Community Energy Grant (CEG) Neighbourhood groups, housing associations or sports clubs bundling multiple homes External wall insulation as part of a wider community retrofit package An approved aggregator submits one application for the whole group; projects must show a community benefit

Frequently Asked Question

  • Do I need planning permission?
    Generally no, as EWI is considered maintenance, but protected façades may need a Section 57 declaration from DLRCoCo.

  • Which insulation board is best — EPS or mineral wool?
    EPS excels at affordability and low U-values; mineral wool wins on fire-rating and breathability. Both carry NSAI certification.

  • How long does the job take?
    A typical 3-bed semi completes in 3–4 weeks, weather-dependent.

  • Will it change the look of my red-brick?
    We can apply brick-slip cladding to match your original façade.