House Extensions That Add Space, Light & Real Value

Rear, side-return and wrap-around builds across Blackrock, Dún Laoghaire, Stillorgan, Monkstown & Mount Merrion.

Why Extend?

Most 1970–90 homes around Dublin were laid out for smaller families and separate rooms; today’s open-plan life needs more flow and better garden connection. Home extensions deliver up to 40 m² extra floor-area without formal planning when the house has never been extended before, thanks to Schedule 2 exemptions in Irish planning law. Homeowners report budgeting €1,800 – €2,500 per m² for a builders-finish in 2025, depending on glazing and insulation spec. 

image
image

Planning Snapshot

Exempt size limit
40 m² at ground level; anything bigger, or a second storey, needs permission.

Distance & height rules
two-metre set-back from boundaries for first-floor work, max ridge 6 m on pitched roofs.

Protected facades
if the house is listed, or the extension alters the front elevation, lodge a full planning file.

Popular Extension Types

Style Typical Gain Key Design Notes
Rear Kitchen-Diner 20–30 m² Roof lights + bifold or French doors catch 2025’s “indoor-outdoor” trend.
Side-Return 12–18 m² Ideal for Victorian terraces; slimline glazing keeps the alley bright.
Wrap-Around (L-Shape) 30–40 m² Combines rear & side; needs structural steel and Part L energy upgrade.
Double-Storey Add-On 30 m² + Adds bedroom above; height & overlooking rules apply.
image
image

Can I Get a Grant?

Grant Route Covers Extension Work? How It Helps
Individual Insulation Grants Yes – if you upgrade walls or attic at the same time. (seai.ie) Flat-rate payments knock thousands off fabric costs.
One-Stop-Shop (Deep Retrofit) Yes – when the extension is bundled with whole-house upgrades to BER B2+. (seai.ie) Grant values deducted up-front; SuperHomes handles paperwork.
Energy Upgrade Scheme (€700–€10k range) Partial – solar PV & heating controls often paired with new open-plan spaces. Cash boosts plus low-interest green loans.

From First Sketch to Finished Room

  1. Free site chat – we measure, flag planning limits & outline budget.

  2. Concept & quote – fixed price once layout and glazing agreed.

  3. Planning or exemption cert – if required, we prepare drawings & lodge.

  4. Build phase – average rear/side extension takes 8–12 weeks on site. 

  5. Snag + handover – includes airtightness report & Part L cert where fabric upgraded.